Project Brief

Black calendar icon.

12th April 2018

Icon of four black squares arranged in a 2x2 grid, within a rounded white border.

Commercial


Details

Construction worker with a water droplet inside a circle.

Three Plumbers

Electrician wearing a hard hat and vest with a lightning bolt symbol.

Two Electrician

Construction worker with a hard hat and saw.

Two Carpenters

Metal grate installed in construction site. White PVC pipes and dirt surround the rectangular structure.

This project was the set up and installation of all preliminary plumbing works for a Thai restaurant in Frankston,


The works completed included installation of a new 2000ltr grease interceptor at the rear of the restaurant,


new trade waste service piping that connected to the grease interceptor and sewer main, new sewer lines throughout to service toilets and kitchen areas,


main cold water feed from a newly installed check meter and a new gas main from existing gas meter to service the needs of the restaurant and kitchen.

Trench with plumbing pipes laid inside. The pipes are black and white, running along the dirt.
Concrete floor with plumbing pipes and trenches filled with gravel.

After the installation was complete, the precise planning allowed the following trades to fit out the restaurant with little effort,


giving a great end result to the customer.

Construction worker installing a copper pipe in a trench, wearing safety vest and beanie, smiling.
White PVC pipe installed in a trench next to a square grate.
Copper pipe running along a red brick wall, above trash bins and a metal fence.